Free Shipping Australia Wide on all orders over $250

Rogz Control Long Lead For Dogs
  • Rogz Control Long Lead For Dogs
  • Rogz Control Long Lead For Dogs
  • Rogz Control Long Lead For Dogs
  • Rogz Control Long Lead For Dogs
  • Rogz Control Long Lead For Dogs

Brand

Rogz Control Long Lead For Dogs

Stock Code:
HLLOC25A
Stock Code:
HLLOC25B
Stock Code:
HLLOC25C
Stock Code:
HLLOC25H
Stock Code:
HLLOC25K
Stock Level
In Stock
In Stock
In Stock
In Stock
In Stock
In Stock
Image Code Name Favourites Stock Level Price Quantity
Rogz Control Long Lead Black Xlge
HLLOC25A
Rogz Control Long Lead Black Xlge
Stock Level:
In Stock
Rogz Control Long Lead Blue Xlge
HLLOC25B
Rogz Control Long Lead Blue Xlge
Stock Level:
In Stock
Rogz Control Long Lead Red Xlge
HLLOC25C
Rogz Control Long Lead Red Xlge
Stock Level:
In Stock
Rogz Control Long Lead Dglo Yellow
HLLOC25H
Rogz Control Long Lead Dglo Yellow
Stock Level:
In Stock
Rogz Control Long Lead Pink Xlge
HLLOC25K
Rogz Control Long Lead Pink Xlge
Stock Level:
In Stock

Description

Rogz Classic Lead


The Rogz Classic Lead leads the way when it comes to control and protection. This lead is jam-packed with safety features. Equipped with high abraison-resistant durable nylon webbing and polyester reflective stitching to keep you and your dog visible when you're out on your night-time walk. It also features a corrosion-resistant zinc snap hook, waste bag holder and accessory d-ring for ID tag attachment. All components of the lead are tough, weather resistant, waterproof, long lasting, and versatile.


Durable Webbing - Tightly stitched Nylon webbing with high abrasion resistance, this lead will last a long time.


Reflective Stitching - Reflective Yarn woven into webbing and piping for night visibility.


Snap Hook - Corrosion-resistant zinc snap hook for convenient connection.


Waste Bag Holder - Accessory to hold your waste bags.


Accessory D-Ring - For ID tag attachment.


Materials:


Webbing: 100% Abrasion-Resistant Nylon
Reflective Stitching: Polyester
Snap Hook: Corrosion-Resistant Zinc Compound


Please note: This product is currently undergoing some changes, please bear with us as there may be variations in style.


 


 


 

Rogz Classic Lead


The Rogz Classic Lead leads the way when it comes to control and protection. This lead is jam-packed with safety features. Equipped with high abraison-resistant durable nylon webbing and polyester reflective stitching to keep you and your dog visible when you're out on your night-time walk. It also features a corrosion-resistant zinc snap hook, waste bag holder and accessory d-ring for ID tag attachment. All components of the lead are tough, weather resistant, waterproof, long lasting, and versatile.


Durable Webbing - Tightly stitched Nylon webbing with high abrasion resistance, this lead will last a long time.


Reflective Stitching - Reflective Yarn woven into webbing and piping for night visibility.


Snap Hook - Corrosion-resistant zinc snap hook for convenient connection.


Waste Bag Holder - Accessory to hold your waste bags.


Accessory D-Ring - For ID tag attachment.


Materials:


Webbing: 100% Abrasion-Resistant Nylon
Reflective Stitching: Polyester
Snap Hook: Corrosion-Resistant Zinc Compound


Please note: This product is currently undergoing some changes, please bear with us as there may be variations in style.


 


 


 

Rogz Classic Lead


The Rogz Classic Lead leads the way when it comes to control and protection. This lead is jam-packed with safety features. Equipped with high abraison-resistant durable nylon webbing and polyester reflective stitching to keep you and your dog visible when you're out on your night-time walk. It also features a corrosion-resistant zinc snap hook, waste bag holder and accessory d-ring for ID tag attachment. All components of the lead are tough, weather resistant, waterproof, long lasting, and versatile.


Durable Webbing - Tightly stitched Nylon webbing with high abrasion resistance, this lead will last a long time.


Reflective Stitching - Reflective Yarn woven into webbing and piping for night visibility.


Snap Hook - Corrosion-resistant zinc snap hook for convenient connection.


Waste Bag Holder - Accessory to hold your waste bags.


Accessory D-Ring - For ID tag attachment.


Materials:


Webbing: 100% Abrasion-Resistant Nylon
Reflective Stitching: Polyester
Snap Hook: Corrosion-Resistant Zinc Compound


Please note: This product is currently undergoing some changes, please bear with us as there may be variations in style.


 


 


 

Rogz Classic Lead


The Rogz Classic Lead leads the way when it comes to control and protection. This lead is jam-packed with safety features. Equipped with high abraison-resistant durable nylon webbing and polyester reflective stitching to keep you and your dog visible when you're out on your night-time walk. It also features a corrosion-resistant zinc snap hook, waste bag holder and accessory d-ring for ID tag attachment. All components of the lead are tough, weather resistant, waterproof, long lasting, and versatile.


Durable Webbing - Tightly stitched Nylon webbing with high abrasion resistance, this lead will last a long time.


Reflective Stitching - Reflective Yarn woven into webbing and piping for night visibility.


Snap Hook - Corrosion-resistant zinc snap hook for convenient connection.


Waste Bag Holder - Accessory to hold your waste bags.


Accessory D-Ring - For ID tag attachment.


Materials:


Webbing: 100% Abrasion-Resistant Nylon
Reflective Stitching: Polyester
Snap Hook: Corrosion-Resistant Zinc Compound


Please note: This product is currently undergoing some changes, please bear with us as there may be variations in style.


 


 


 

Rogz Classic Lead


The Rogz Classic Lead leads the way when it comes to control and protection. This lead is jam-packed with safety features. Equipped with high abraison-resistant durable nylon webbing and polyester reflective stitching to keep you and your dog visible when you're out on your night-time walk. It also features a corrosion-resistant zinc snap hook, waste bag holder and accessory d-ring for ID tag attachment. All components of the lead are tough, weather resistant, waterproof, long lasting, and versatile.


Durable Webbing - Tightly stitched Nylon webbing with high abrasion resistance, this lead will last a long time.


Reflective Stitching - Reflective Yarn woven into webbing and piping for night visibility.


Snap Hook - Corrosion-resistant zinc snap hook for convenient connection.


Waste Bag Holder - Accessory to hold your waste bags.


Accessory D-Ring - For ID tag attachment.


Materials:


Webbing: 100% Abrasion-Resistant Nylon
Reflective Stitching: Polyester
Snap Hook: Corrosion-Resistant Zinc Compound


Please note: This product is currently undergoing some changes, please bear with us as there may be variations in style.


 


 


 

Customer Reviews and Ratings

No Reviews

Be the first to review this product!

Customer Reviews and Ratings

No Reviews

Be the first to review this product!

Customer Reviews and Ratings

No Reviews

Be the first to review this product!

Customer Reviews and Ratings

No Reviews

Be the first to review this product!

Customer Reviews and Ratings

No Reviews

Be the first to review this product!

Details

  • Carton Quantity:
    10
  • Product Dimensions:
    20 x 50 x 1280
  • Product Weight:
    0.189

Details

  • Carton Quantity:
    10
  • Product Dimensions:
    20 x 47 x 1280
  • Product Weight:
    0.189

Details

  • Carton Quantity:
    10
  • Product Dimensions:
    20 x 47 x 1300
  • Product Weight:
    0.189

Details

  • Carton Quantity:
    10
  • Product Dimensions:
    20 x 47 x 1280
  • Product Weight:
    0.189

Details

  • Carton Quantity:
    10
  • Product Dimensions:
    20 x 47 x 1300
  • Product Weight:
    0.189